Small Business Resources, Business Advice and Forms from AllBusiness.com

I-5 / Gilman Bridge RFP Announced; Proposals Due 23 May.(pedistrian/bike lanes to be built...

The University of California, San Diego (UCSD) in LaJolla held a mandatory attendance bidders conference on Thursday, 27 April regarding the construction of the 137.160 meter-long FRP composites and hybrid materials demonstration project bridge to be built across Interstate 5 in San Diego. The two-lane width with pedestrian walk and bikeways is 18.288m, and the structural depth is approximately 1.450m. AASHTO HS-20 structural loading design is required.

The I-5 / Gilman Advanced Technology Bridge Project RFP #0013AWM was issued on April 12, 2000. Response to the RFP f

In addition, make sure to read these premium articles also available with your free trial: